How a Royal Roofing Replacement Runs, From Estimate to Final Walk-Through
Five steps, a couple of days of work on the roof, and a clear idea of what comes next at each stage.
September 30, 2026 · 4 min read

A new roof is a major purchase, and most of the anxiety around it comes from not knowing what happens next. Royal Roofing, based in Pasco, runs every residential project in the same five steps. Knowing the sequence makes the decision easier, because you can see where the price gets firm, when the crew arrives and what you will be asked to do. Here it is in order.
Step one: request an estimate
Call 509.547.8475, email the estimates address, or fill out the request form at /request-an-estimate. Royal Roofing says you will receive a complimentary estimate within 24 hours, and the estimate page repeats it as a 24-hour response, guaranteed. The office is open Monday through Friday, 8:00 AM to 5:00 PM, so a request sent on a Friday afternoon may not be answered until the next business day.
Step two: the on-site inspection
If you would like to move forward, a site inspection takes place to determine any project-specific needs and adjust the quote accordingly. This is the step that turns an estimate into something you can plan around. Decking condition, flashing, ventilation and the shape of the roof all affect the work, and none of them can be seen reliably from the ground. Ask the inspector to point out anything that could change the price, so there are no surprises in step three.
Step three: final quote and financing
You receive the final quote, discuss warranty details and explore financing options. The warranty conversation is worth real attention. As a certified GAF Master Elite contractor, Royal Roofing can offer the Golden Pledge, Silver Pledge and Systems Plus levels, and the difference between them is how long workmanship is covered. The /residential page lays out each level.
Financing runs through PowerPay, a lender Royal Roofing has partnered with to make the process easier. The company says loan applications are typically approved the same day and funded in as little as one week. The application link sits on the residential and metals pages, so you can apply before the crew is on the calendar. Apply early if your timing matters.
Step four: professional installation
Pending weather, roofing installations can be completed between 2 and 3 business days. Siding installations run 1 to 2 weeks, and repairs can be done in as little as 1 to 2 business days. Weather is the one variable nobody controls, and a crew that waits out bad conditions is doing you a favor. Ask the office who will be running the crew that day and how to reach them, so a question on install morning does not turn into a game of phone tag.
Customers describe this stage in consistent terms. Elvira Farkas wrote that "the crew was in sync, no time was lost and the removal and installation was done in 2 days." David Puckett said "from scheduling to actual install was exactly as Royal said it would be," and that the crew "showed up on time and stuck to the schedule we agreed on." Both come from Google reviews, where Royal Roofing holds a 4.7 rating from 247 reviews.
What to do before the crew arrives
- Move vehicles out of the driveway and away from the edges of the house.
- Clear patio furniture, grills and planters from around the foundation.
- Take down wall hangings on the top floor, since tear-off can shake a house.
- Tell the crew about pets, children and any spots you want kept clear.
- Confirm the schedule with the office a day or two before the start date.
Step five: the wrap-up
The final step is the project wrap-up, where you enjoy the roof, with up to 100% parts and labor guaranteed depending on warranty level. In practice it includes cleanup and a last look at the work. Viviana Fowler wrote that the crew "cleaned up amazingly after their work was done," followed by "a final walk thru done by one of their employees, Freddy, to make sure everything was done." That last walk is your chance to ask questions while the crew is still there.
Joe Madrigal's review mentions something else worth knowing about. He said the company "really stood out by providing before-and-after drone photos, which made it easy to see the quality of their work and gave me confidence in the job." If you want a record of the roof, ask about photos at the start.
If you are comparing roofers, put the five steps side by side and ask each one what happens at each stage. Elvira Farkas said she collected 6 other estimates before hiring Royal Roofing, and that the others meant higher prices and cheaper materials. Collecting a few bids is a sensible habit, and the estimate is complimentary. Line the bids up by scope, materials, warranty level and schedule, because a low number that leaves one of those out is not really lower. To begin, call 509.547.8475 or visit /request-an-estimate. More about the company's roofing, siding and repair work is on the /residential and /services/repairs pages.
Royal Roofing, 509.547.8475
Call 509.547.8475More articles
Choosing a Metal Roof in Eastern Washington: Standing Seam or Screw-Through
The two main metal roof systems look alike from the road and behave very differently over the years.
GAF Golden Pledge, Silver Pledge and Systems Plus: What Each Warranty Covers
The three levels cover the shingle the same way. They differ on how long the installer's work is covered.